SITE SEARCH

Try: DN110, elbow, insulation

Back to newsInstallation Note / 2026-07-12

Four steps for inspecting piping connection nodes

A practical review of surface preparation, insertion depth, joining process and final inspection.

Before joining, verify that pipes, fittings and tools match project requirements, and keep connection surfaces clean, dry and free from visible damage.

During installation, follow product documentation for insertion depth and joining time, and avoid additional loads before the connection has stabilized.

After completion, inspect appearance, orientation and location, then create the process records and verification documents required by the project.